Near Seward Park, on Lake Washington.
MLWgc was contracted to add a 4thstory addition to this Lake Washington residence.
This addition shows an extensive knowledge of framing to finish.
In addition to the complicated framing, starting with carrying the structural loads down 3 floors to the foundation, there were also the of access from the 3rd floor via a spiral staircase.
A separate heating/cooling system was needed and resulting duct work was installed into the floor framing.
The roof lines and the interior finish work that followed those roof lines was a fun challenge.
There was also an addition to the carport, with of GLBeams.